@TriumphGold $TIG $NFRGF 13,000 Metre #Drill #Program Underway at #Freegold #Mountain #Project, #Yukon

Triumph Gold TSXV.TIG commenced a 13,000 metre diamond drill program at its road accessible Freegold Mountain project in the Dawson Range, Yukon. The program will test several new drill targets identified during 2016 field exploration and data review.  The 2016 work focused on identifying geological controls on mineralization at the Revenue and Nucleus porphyry deposits… Continue reading @TriumphGold $TIG $NFRGF 13,000 Metre #Drill #Program Underway at #Freegold #Mountain #Project, #Yukon

@dynaCERT $DYA $DYFSF Announces #Financial Results for the 1st Quarter of Fiscal 2017

dynaCERT Q1 Highlights: Revenue of $1,380,350 on the delivery of 215 HG1 units Gross profit of $653,502 Gross margin of 47% Net operating income before stock based compensation of $199,188 Net income of $482,175 Cash balance at the end of Q1 of $1,093,944 Robert Maier, COO of dynaCERT, states, “We are executing well and gaining… Continue reading @dynaCERT $DYA $DYFSF Announces #Financial Results for the 1st Quarter of Fiscal 2017

@TriumphGoldCorp $TIG $NFRGF 2017 #Exploration Plans #Gold #Yukon

Triumph intends to execute a $4 million exploration program on the Freegold Mountain property, as well as smaller reconnaissance mapping and sampling projects on Tad/Toro and Severance properties in Yukon and Andalusite Peak in northern British Columbia. Exploration on the Freegold Mountain property will commence in late May and extend until early October.  The work… Continue reading @TriumphGoldCorp $TIG $NFRGF 2017 #Exploration Plans #Gold #Yukon

@dynaCERT $DYA $DYFSF Collaboration with Northwest Territory Power Corp.

dynaCERT announced the collaboration with the Northwest Territory Power Corp. in Yellowknife, NT in a fuel savings and emission reduction pilot project located in Deline, NT. Delines is located on the southwest share of Great Bear Lake, about 400 km northwest of Yellowknife. Deline is only serviced via aircraft and winter ice roads. The NTPC… Continue reading @dynaCERT $DYA $DYFSF Collaboration with Northwest Territory Power Corp.

@PistolBayMining $PST Increases Size of Confederation Lake VTEM Survey

Pistol Bay expanded the upcoming VTEM airborne electromagnetic and magnetic survey to cover almost twice the area of the original survey plan. Geotech Limited is contracted to survey the 40 km length of the Confederation Lake greenstone belt, southeast of Red Lake, Ontario. With a larger loop, more power and better signal-to-noise resolution than earlier… Continue reading @PistolBayMining $PST Increases Size of Confederation Lake VTEM Survey

@PistolBayMining $PST Executes LOI to Option Copperlode Property with Five Known Zinc-Copper Zones

Pistol Bay has the option to acquire up to an 80 percent interest in the Copperlode Property by making certain payments and share issuances.  The Copperlode Property consists of four mining claims comprising 31 claim units for a total area of approximately 496 hectares or 1,225 acres.  Frontline holds the claims under option from a… Continue reading @PistolBayMining $PST Executes LOI to Option Copperlode Property with Five Known Zinc-Copper Zones

@PistolBayMining $PST Closes #Financing, Extends Expiry on #Warrants

Pistol Bay $PST closed a non-brokered private placement financing for gross proceeds of $336,600, issuing 3,960,000 units at a price of $0.085 per unit, each unit comprising of one common share and one transferable share purchase warrant, with each warrant entitling the holder to purchase one additional common share for a period of 18 months… Continue reading @PistolBayMining $PST Closes #Financing, Extends Expiry on #Warrants

@PistolBayMining $PST to Commence VTEM (TM) Survey, Confederation Lake Project, Northwest Ontario

Pistol Bay $PST has contracted Geotech Ltd to carry out a 1,128 line-km helicopter-borne survey of the central part of the Company’s land position in Ontario. The survey will use Geotech’s Versatile Time-Domain Electromagnetic (VTEM Plus) system, which  includes a horizontal magnetic gradiometer. Pistol Bay anticipates that this survey will explore the survey area to… Continue reading @PistolBayMining $PST to Commence VTEM (TM) Survey, Confederation Lake Project, Northwest Ontario

@dynaCERT $DYA $DYFSF Receives CE Certification for HydraGEN (TM) #Technology in #Europe

dynaCERT $DYA $DYFSF has received CE Certification for its HydraGENTM techology for shipments to clients within Europe. Specifically, the models HG1 (Class 6-8 trucks), HG2 (Class 2-5 trucks, refrigerated trailers and shipping containers) and HG3 (diesel-powered ocean ships, locomotives and stationary generators). The letters “CE” are the abbreviation of French phrase “Conformité Européene” which literally… Continue reading @dynaCERT $DYA $DYFSF Receives CE Certification for HydraGEN (TM) #Technology in #Europe

Untitled

Broad Oak Associates is providing a revised 43-101 compliant mineral resource for the Arrow Zone. The Arrow Zone is the most advanced mineralized zone on the 17,400 acres Confederation lake VMS project. The new resource estimate is not expected to differ by more than a few percent from the 2007 estimates. Save