Metanor has provided this update on its underground exploration drilling program at Bachelor Mine. The drill located on level 8 in the Hewfran sector of Bachelor Mine intersected 7.5 g/t over 7.2 meters (hole 8-112). The holes listed below intersected the structure of the H-10 vein below level 8 down to level 10.
Hole N° | From (m) |
To (m) |
length (m)* |
Au grade capped (g/t) |
True width (estimated) |
8-112 | 57.1 | 64.3 | 7.2 | 7.5 | 95% |
8-113 | 58.4 | 59.0 | 0.6 | 2.9 | 90% |
8-114 | 67.2 | 68.0 | 0.9 | 2.6 | 85% |
8-115 | 80.0 | 81.2 | 1.2 | 6.4 | 80% |
*Core length
Following the confirmation of this extension, the upcoming drilling will focus on both sides of this structure between level 8 and 10, and below level 10. A longitudinal figure is available at the following link: http://media3.marketwire.com/docs/1040369a_fig1.jpg.
Go to www.metanor.ca for full news release
Nancy