Over the summer Grizzly Discoveries “GZD” has been busy with their Stage 1 field-based exploration program on their 225,000 contiguous acre gold/copper/silver project in Greenwood, B.C. A quick summary: From May 2011 to date, there have been 6,700 soil samples and 394 rock grab samples collected and shipped to ALS Chemex in Vancouver. More than 94 line-km of IP surveys, more than 75 line-km ground HLEM and Promis EM surveys, and more than 105 line-kim of ground magnetic surveys have also been completed. Results from this field-based exploration will be forthcoming. Grizzly also announced that the drill rig has been mobilized to Greenwood and are preparing for drilling which should be any day now. Drilling permits have been approved for the Ket 28, Dayton and Motherlode target areas and a 4,000 – 5,000 metre drill program is planned.