Metanor CVE:MTO Extends Its “A” Vein by Intersecting 9.5 g/t Over 10.1m at Bachelor – IR Pro Communications Inc.

Metanor CVE:MTO Extends Its “A” Vein by Intersecting 9.5 g/t Over 10.1m at Bachelor

Metanor Resources (TSX.V-MTO) (OTCBB: MEOBF) has extended its “A” Vein at the Bachelor Mine by intersecting 9.5 g/t gold over 10.1m.

Metanor Resources Inc. Logo

Four diamond drills are presently operating underground with over 2,500 metres drilled per month.  On March 13th, the company issued the results from the drill located on level 14.  Today, Metanor releases the results from the other three drills located on levels 5, 8, and 12.  The results from the exploration drilling on level 5 confirms the extension of the «A» vein north of the shaft between levels 5 and 6 where the vein was identified from the drift development on these levels.
The drillings completed on levels 8 and 12 allow better definition and increase the resources in the Hewfran East and Main zones for production in the coming months.
See www.metanor.ca for the full news release.
Nancy
 

Leave a comment